Vaccines

A sterile vaccine facility with BSL-2 containment

For a contract vaccine manufacturer (CMO) in Montreal, PBE Expert delivered a sterile facility with BSL-2 biological containment on an EPCMV basis, from design to inspection.

  • FDA
  • EMA
Loading vials into a freeze dryer, in sterile gowning

Project fact sheet

Client
Contract vaccine manufacturer (CMO)
Location
Montreal, Quebec
Engagement
EPCMV
Facility
Contract vaccine manufacturing (CMO), BSL-2, sterile

Engagement : EPCMV

  1. EEngineeringEngineering
  2. PProcurementProcurement
  3. CConstructionConstruction
  4. MManagementManagement
  5. VValidationValidation
Next project · SwitzerlandVaccine projectFor a Swiss biopharmaceutical company, PBE Expert led the EPCMV construction of a contained biotech production unit for a sterile E. coli vaccine (BSL-2).

See alsoProjectsFormAction™

Let’s talk about your project.

A new site, an expansion, an inspection to prepare for: describe your project and one of our experts will get back to you.

Talk to an Expert